IBM Boilers / Burners

Case Study: IBM

CASE STUDY DETAILS Company: IBM – Somers, NY Engineer: JMV EngineeringContractor: Skanska The Central Heating Plant boilers were in ill repair and in need of replacement. Height restrictions in the mechanical space limited the boiler room options. ATI was called upon to provide a solution to supply two (2) 600 HP, #2 oil fired Low […]

Continue reading
Regerneron Case Study

Case Study: Regeneron Pharmaceuticals

CASE STUDY DETAILS Company: Regeneron Pharmaceuticals – Tarrytown, NYEngineer: Vanderweil EngineeringContractor: The Pike Company Regeneron Pharmaceuticals, Inc. is a biotechnology company headquartered in Tarrytown, New York. The company was founded in 1988. Originally focused on neurotrophic factors and their regenerative capabilities (thus the name), it branched out into the study of both cytokine and tyrosine kinase receptors. The Pike Company […]

Continue reading
East River Housing Case Study

Case Study: East River Housing

CASE STUDY DETAILS Company: East River Housing Engineer: G. Goldman EngineeringContractor: Dynamic Mechanical Climate Change & Environmental Services (CCES) managed the construction management and environmental permitting for a major boiler modernization project for a large apartment complex in NYC that has reduced emissions and saved substantial energy costs. East River Housing (ERH) Corporation operates a boiler house providing […]

Continue reading
Amneal Case Study

Case Study: Amneal Pharmaceuticals

CASE STUDY DETAILS Location: Amneal Pharmaceuticals – Yaphank, NY Engineer: WSP EngineeringContractor: Kulka Construction/Mechanical Energy Solutions Amneal Pharmaceuticals is a rapidly expanding pharmaceutical manufacturing company with many locations throughout the US and the world. ATI was called in by Kulka construction to facilitate and provide equipment for a new high pressure steam plant for the manufacturing of pharmaceutical […]

Continue reading
machine

Case Study: PepsiCo

CASE STUDY DETAILS Company: PepsiCo – Purchase, NY Engineer: Robert Derector AssociatesContractor: Paverini Construction & B.P. Mechanical The entire mechanical room at Pepsi Headquarters in Purchase NY was marked for replacement including all boilers, chillers and associated mechanical systems. In an effort to increase efficiency and reduce carbon footprint, Pepsi decided to replace the entire boiler plant with condensing […]

Continue reading
machine

Case Study: NY Presbyterian Hospital

CASE STUDY DETAILS Organization: NY Presbyterian Hospital – NYC Engineer: Cosentini AssociatesContractor: HTS & Nelson Air New York Presbyterian Hospital (NYPH) required a new high pressure steam plant to facilitate sterilization and humidity control for a new critical surgical process for spinal cord injury treatment. This vitally important project was time sensitive and had many challenges with […]

Continue reading

Power Flame Gas/#2 Oil Burners in Stock

ATI is proud to announce our immediate availability of C1-GO-10 through C5-GO-30 burners in stock and ready to ship. Each burner is equipped with UL, NYC DEP (regulator unsealed & unstamped), Adjustable Flange, Color Coded Wiring Diagram, Siemens Gas Train, Direct Spark Oil Ignition and more. These burners are equipped and ready to apply to the […]

Continue reading

New Team Member Announcement

ATI is proud to welcome Wendy Parr back to the team! We are pleased to announce the immediate addition of Wendy Parr back to the Customer Service team. Wendy is well known by most of our customer base and has an outstanding track record of excellence in dealing with customers for all of our product lines. […]

Continue reading

Who Needs to “Blow off Some Steam?”

A question that comes up quite often is “Do I need to install a blow down separator with my steam boiler?” Our answer is YES. Why? In New York State, it is not permissible, by code, to discharge water from a boiler system that is >140 degrees, F. As blow-down from a steam boiler enters the […]

Continue reading

Water Treatment for Steam Boiler Applications

A properly exercised water treatment program for steam boiler applications is essential to satisfy three main objectives: continuous heat exchange, production of high quality steam, and corrosion/deposition protection. A water treatment program consists of both external and internal treatment where preventative measures are achieved through mechanical and chemical means. Water is known as the universal solvent […]

Continue reading